On Top was engaged to provide a major design-and-construct overhaul of existing electrical infrastructure at the RAAF Richmond sewerage treatment plant.
Project overview
Scope delivered by On Top.
On Top was engaged to provide a major design-and-construct overhaul of existing electrical infrastructure at the RAAF Richmond sewerage treatment plant.
Electrical scope
- 800 A site main switchboard
- 800 A consumer mains
- Motor control centre
- Site distribution boards
- External-rated stainless-steel distribution boards
- New submains
- Underground pits and conduits including hydro-excavation works
- Motor connections and control stations
- Run/stop indicator lights
- Emergency-stop system
- Float switches
- 250 A submains and plant distribution board