Commercial Fit-OutAnzac Rifle Range, Malabar
The Anzac Rifle Range project involved the removal of existing electrical infrastructure and installation of new power and lighting systems along the rear of a new retaining wall.
View projectFrom office refurbishments to community buildings, we coordinate lighting, power, communications, controls and emergency systems into a complete package.
From office refurbishments to community buildings, we coordinate lighting, power, communications, controls and emergency systems into a complete package.
Discuss a commercial fit-out project
Commercial Fit-OutThe Anzac Rifle Range project involved the removal of existing electrical infrastructure and installation of new power and lighting systems along the rear of a new retaining wall.
View project
Commercial Fit-OutThe Taronga Zoo Platypus Research Centre project involved a complete electrical infrastructure upgrade to support specialised aquatic research facilities and life-support systems for the platypus habitat.
View project
Commercial Fit-OutThe Jesus Family Centre project involved the complete electrical fit-out and infrastructure upgrade of a refurbished worship and community facility designed for congregational gatherings and events.
View projectThe Animal Shelter project involved the complete electrical installation for a modern animal-care and adoption facility designed to house up to 65 cats and 24 dogs across adoption, isolation and impound areas. The facility also includes reception areas, offices, laundry, food-preparation spaces, grooming rooms, storage, staff amenities and extensive outdoor enclosures.
View projectThe SES Facility project involved the complete electrical-services installation for a new purpose-built emergency-services building. The facility includes three vehicle bays, storage areas, training and meeting rooms, offices, kitchen, change rooms and amenities, with a passive recreation area to the rear.
View projectOn Top supplied and installed new lighting, power, switchboards and submains. The team also repaired existing non-compliances in the main switchboard.
View projectBaseline Projects chose On Top for the new office fit-out at ORIX Macquarie Park. The scope included new lighting, power outlets and data cabling tailored to the office requirements, together with in-house C-Bus and DALI programming to deliver a modern and functional workplace.
View projectBaseline Projects constructed a stylish modern office space in Glendenning. On Top provided new general and emergency lighting, exit signs, a new distribution board, power soft wiring and data cabling.
View projectBaseline Projects constructed a stylish modern office space in Crows Nest. On Top provided new general and emergency lighting, exit signs, a new distribution board, power soft wiring and data cabling.
View projectOn Top completed a three-building extension at Kelso Park, including new lighting, power, submains and distribution boards.
View projectBaseline Projects undertook roofing projects across 11 TAFE campuses in NSW, partnering with On Top for electrical and mechanical works.
View projectOn Top completed a new amenities building at Marco Reserve, Panania. The project included demolition of the existing amenities building and installation of new electrical services to a BCA-compliant facility comprising change rooms, kiosk, club rooms, storage rooms, public and private amenities and an outdoor covered area overlooking the playing fields.
View projectOn Top provided new lighting, power and subcircuits to a parachute-drying tower at RAAF Richmond. Male and female bathrooms and change rooms were also renovated as part of the works.
View projectBaseline Projects engaged On Top to implement off-grid amenities at the Defence Singleton Range. The project involved designing and installing independent electrical systems for a remote area without a conventional grid connection.
View projectBaseline Projects selected On Top to complete electrical alterations in common areas and office spaces at HMAS Penguin. The works included replacement of distribution boards, management of isolations and make-safes, and installation of new lighting, power outlets and electrical fixtures to suit the revised spaces.
View projectOn Top was engaged to upgrade lighting and power systems for the garages and balconies of Building 16 at HMAS Penguin as part of broader remediation works.
View projectOn Top was engaged by Baseline Projects to provide an electrical upgrade for Building C003 at Holsworthy Barracks, modernising the building’s electrical infrastructure to improve functionality and safety.
View projectOn Top worked with Baseline Projects to deliver post-mouse-plague rectification works at Wellington Correctional Centre.
View projectOn Top was engaged for a mould-remediation project at Fleet Base East, HMAS Kuttabul. The works also included a fire-safety upgrade with new emergency lighting to a large six-storey building.
View projectOn Top provided new lighting, power, a switchboard, consumer mains, air conditioning and mechanical units for a new veterinary clinic at Greystanes.
View projectThe project involved construction of a new amenities building at Percival Park, Rose Bay, including family-friendly and accessible toilets, outdoor showers, a drinking fountain with dog bowl, new access paths and upgraded surrounding landscaping. The site was near a popular beachfront with limited construction access and close to a Sydney Water pumping-station area.
View projectOn Top was engaged by Baseline Projects to provide an emergency-lighting upgrade as part of a fire-safety initiative for three buildings at the Defence Orchard Hills facility. The project involved the design and installation of new emergency-lighting systems.
View projectOn Top completed electrical services for a new staff building at St Heliers Correctional Centre.
View projectOn Top was engaged by Baseline Projects to provide new lighting and power services to three levels of existing ablutions undergoing renovation at RAAF Richmond.
View projectOn Top delivered an architecturally designed public-amenities project at Bicentennial Park, Yarra Bay.
View projectOn Top was engaged by Baseline Projects to provide new submain cabling to a modular-building extension of an existing childcare facility. The works required modifications to the upstream main switchboard to maintain compliance with the MIEE.
View projectOn Top provided electrical make-safe works, disconnections and new power supplies for the refurbishment of four living-in-accommodation buildings, including installation of RCD protection on existing distribution boards.
View projectOn Top was engaged to provide new power infrastructure, submains and distribution boards at RAAF Base Glenbrook.
View projectOn Top delivered new electrical services for public amenities at Malabar Junction.
View projectOn Top worked with SDL Projects to deliver an architecturally designed public-amenities project at Mosman.
View projectLitt Racing engaged On Top to provide new electrical works to its new stables at Warwick Farm.
View projectMitchell High School in Blacktown required substantial works to four buildings containing asbestos-positive vermiculite ceilings. All lighting, mechanical and subcircuit cabling was assessed as contaminated and required replacement.
View projectWarners Bay High School required substantial works to a building containing asbestos-positive vermiculite ceilings. All lighting, mechanical and subcircuit cabling was assessed as contaminated and required replacement.
View projectSwansea High School required substantial works to a building containing asbestos-positive vermiculite ceilings. All lighting, mechanical and subcircuit cabling was assessed as contaminated and required replacement.
View projectA modern office fit-out designed to use the available space logically.
View projectOn Top completed an electrical upgrade for a healthcare medical centre at HMAS Kuttabul.
View projectThe Tooheys Lidcombe facility required a new staff lunch room and locker room.
View projectA modern office fit-out designed to use the available space logically.
View projectThe project involved renovation of 26 living-in-accommodation units, including new lighting, mechanical units, power, distribution boards and subcircuit cabling.
View projectWe help clients identify constraints and deliver projects with a practical approach.